Jump to content

Case studies

Shoosmiths

The Brief

Speed and confidentiality were key. Shoosmiths wanted to set up a new office in central Birmingham in minimum time and with maximum impact. The Harmsen Group checked out the new space before the lease was signed and then delivered a fast-track project.

The Headlines

  • 8 week full design and build programme
  • Highly flexible work environment designed to handle growth
  • Initially 20 staff, now over 100 and continuing to grow
  • High-profile, shared building
  • Excellent working relationship with the building manager

The Result

The Harmsen Group's design and subsequent fit out has set the new benchmark standard for Shoosmiths and has produced a vibrant and integrated work environment that accurately reflects Shoosmiths image as a dynamic and expanding law firm.


Back to top